Failed the inspection? Sort the fixes into an order
Get your list staged
Tell us which findings are on your report. We will sort them into stages and price the items we have figures for.
Stage one: before the next fire
These are the findings that make the fireplace unsafe to light. A cracked or broken flue liner, gaps where heat can reach the framing, a firebox wall that has split through, a damper that will not open. Until they are fixed the fireplace should not be used, so they come first.
Most of these have no published price because the extent of the damage varies. Liner work is priced from the camera footage. Firebox and damper repairs are priced after we have looked at them. You get each as its own line.
- Cracked or missing flue liner
- Gaps between the firebox and framing
- Split firebox walls
- A damper that cannot be opened
Stage two: before the winter rain
Water is the next priority because the damage it does grows with each storm. A missing cap, rusted flashing, a cracked top slab and open joints all let rain into the brick and the roof framing. In Cudahy that means getting them done in the dry months, before the rainy season starts.
This stage holds most of the repairs we publish prices for: a cap, leak tracing and closing the entry points, and a saddle behind a wide chimney with or without new metal. Crown and flashing work on its own gets a written figure.
Stage three: when it suits you
Some findings are worth fixing but are not urgent. Worn mortar that still holds the brick, a stiff damper that closes, staining on the face, a hearth tile that has lifted. We list them so you know they are there and can plan or budget for them.
Some owners use the later stages to change how they heat. If you no longer burn wood, a sealed gas unit in the existing opening can replace a list of firebox repairs. We price that as an option beside the repairs.
Prices for the usual fixes
These are the repairs from a failed report that we publish figures for. A capped top is quoted after we measure. Everything else gets a written price from the inspection.
- Finding where water gets in and sealing each point
- $565 to $3,400
- Uphill saddle that turns roof water aside
- $450 to $1,020
- Saddle plus fresh metal on every side of the base
- $680 to $1,700
- Sealed gas unit fitted into the old opening
- $2,800 to $5,650
- Camera check after the work, for the file
- $395
Crown, liner, damper, chase cover and flashing work on its own are priced in writing after we see them.
Staged repair questions
Is every item on the report a must?
The first group is, before anyone lights a fire again. The water group gets more costly the longer it waits. The last group is your call.
Can I stop using the fireplace instead of repairing it?
You can stop lighting it, which removes the fire risk. Water findings still matter, because rain keeps getting in whether or not you use the fireplace.
Why do some repairs have prices and others do not?
Saddles and leak work repeat often enough to give a range. A cap is quoted after we measure. Liner, crown and firebox work depend on how far the damage goes, which we see only on site or on the footage.
Will you inspect again when the work is done?
Yes, if you want proof on paper. A Level 2 once the repairs are finished records them in photos, at the usual camera inspection price.
Can stages be done in one visit?
Yes, where it makes sense. Combining stage one and two on the same roof visit often saves setup time.
Turn the report into a plan
Go to the contact page with the findings from your report, and we will send back the stages with a price on each line we can price.
Call (323) 524-3599